Phase 7: Advanced Optimization¶
Status: Not Started
Phase 7 is planned for future implementation.
Overview¶
- Objective: Performance optimization and advanced features
- Key Deliverables: Compiler optimization, incremental compilation, advanced type inference
- Estimated Period: Dec 11, 2025 - Dec 31, 2025 (~3 weeks, projected)
Key Features (Planned)¶
Compiler Optimization¶
- ⬜ Inline expansion
- ⬜ Dead code elimination
- ⬜ Constant folding
Incremental Compilation¶
- ⬜ Change detection system
- ⬜ Partial recompilation
- ⬜ Cache mechanism
Advanced Type Inference¶
- ⬜ Global type inference
- ⬜ Type inference optimization
- ⬜ Type error improvements
Performance Optimization¶
- ⬜ Generated code optimization
- ⬜ Memory usage reduction
- ⬜ Build time reduction
Planning
Detailed implementation plan will be formulated after Phase 6 completion.