コンテンツにスキップ

Phase 7: Advanced Optimization

Status: Not Started

Phase 7 is planned for future implementation.

Overview

  • Objective: Performance optimization and advanced features
  • Key Deliverables: Compiler optimization, incremental compilation, advanced type inference
  • Estimated Period: Dec 11, 2025 - Dec 31, 2025 (~3 weeks, projected)

Key Features (Planned)

Compiler Optimization

  • ⬜ Inline expansion
  • ⬜ Dead code elimination
  • ⬜ Constant folding

Incremental Compilation

  • ⬜ Change detection system
  • ⬜ Partial recompilation
  • ⬜ Cache mechanism

Advanced Type Inference

  • ⬜ Global type inference
  • ⬜ Type inference optimization
  • ⬜ Type error improvements

Performance Optimization

  • ⬜ Generated code optimization
  • ⬜ Memory usage reduction
  • ⬜ Build time reduction

Planning

Detailed implementation plan will be formulated after Phase 6 completion.